ReturnHome PageHome

I don't want to close on Pre-Construction 50 Biscayne #5101

How to cancel a pre-construction contract without loosing your deposit ?

This is the question every body would like to have a good solution to.

When you are as disappointed as I am of the quality of 50 Biscayne Building located in Downtown Miami, 50 Biscayne Blvd. what can we all do ?
We need the help of a good lawyer, for sure. The finishing of the building is as inadequate as the material too.
The contract stated that the contractor has 2 years and 6 months to deliver the project. This date has already passed.

 

When the contract has addendums on-the-fly suiting the contractor, what is there to do?

Call us, we have solution: 305 433-2029



50 Biscayne

 

 

 

http://bestmiamideal.com

All rights reserved

Tel Guy: 1 305 776-2428

 

    Movie: Things to do in Miami Beach